--
Tucson Unified School District --Focus on TUSD
--
TUSD Home > News and Events > Focus on TUSD > September 2007 > Blenman Rennovations

Focus on TUSD - September 2007

Blenman Renovations Include New Classrooms, Resource Room and Outdoor Learning Area
Blenman Elementary SchoolAfter 65 years of serving students on Tucson's near north side, Blenman Elementary School was due for a facelift. In keeping with the new look, the additions in the new building project will be energy-efficient and environmentally friendly.

In March, students will move from temporary classrooms in the multipurpose room and two portables into new quarters at the school at 1695 N. Country Club Road.

The $2.3 million project, which began in July and is financed through voter-approved bonds, will have:

  • Nine classrooms measuring about 800 and 850 square feet each.
  • Girls restroom with six toilets and four sinks.
  • Boys restroom with two toilets, three urinals and four sinks.
  • A 123-square-foot testing room.
  • A 252-square-foot resource room that replaces the one torn down to build a breezeway between the new wing and the school. The new room will handle about 200 more students.
  • A small courtyard that can function as an outdoor learning area.
  • A new ramada that replaces the one removed to accommodate the new wing.

The design committee decided early in the planning process that the new facility should be energy efficient, blend in with the existing building and take into account the effect that an addition would have on a small campus.

Construction at Blenman Elementary School

With that in mind, the project features insulated glass, a tempered air system, CO2 sensors and modulating dampers, roof water supplemental irrigation for trees, upgraded wall insulation (roof R-30, walls R-12), natural light usage and waterless urinals.

The outside walls combine tinted, concrete masonry compatible with the original brick and stucco. The main roofs have built-up roofing with smooth emulsion coating. The canopy has clay tile roofing that matches the original roofing as close as possible.

Construction at Blenman

The rooftop package heat pump units, which serve each classroom, will be controlled by all mounted programmable thermostats.

The outdated intercom system will be replaced.

Project committee members are TUSD Project Manager Sue Heathcote; parents, Francesca McBride and Kenneth New; teachers, Bridget Uzzzell and Sonya Norman; teacher and Site Council Facilitator, Jessica Minnich; Blenman faculty, Viola Pace; Bobbe Woods, former principal, and Henry Vega, former assistant principal; Principal Kathryn DeSalvo and Assistant Principal Robin Dunbar, and the architects.

-- By Sharon Dunham
Communications & Media Relations

TUSD - Proud Supporter of Small Classes

IN THIS ISSUE

Pistor Celebrates Tucson's Birthday

Joint Message from Superintendent and Board President

OMA Benefactor Receives Prize

New Mary Meredith School

Blenman Rennovations

Hudlow Fun Walk

Bruce Slabaugh, AFSCME President

OASIS Tutors Needed

Awards and Recognition

Governing Board News

Audit Committee Meets

Looking Ahead

TUSD Wrap Up

All photos in the September issue by Jes Ruvalcaba of Communications & Media Relations.

CONTACT US

Communications & Media Relations
TUSD
1010 E. Tenth St.
(520) 225-6437
Email Us

The deadline to submit material for the October Focus is Friday, Oct. 12. The Focus will be published Monday, Oct. 22. Email submissions to Chyrl Hill Lander or Sharon Dunham in the Communications & Media Relations Department or use the online Tip Sheet.

--

Home | District Information | Governing Board | Student Guidelines | Academic and Instructional Resources | Departments | Schools | Employment | News and Events | Contents

Last Updated: Wednesday, September 19, 2007 1:25:36 PM

Tucson Unified School DistrictFor more information contact:
Tucson Unified School District, 1010 E. 10th Street, Tucson AZ 85719
Telephone: 520-225-6437
E-Mail: webmaster@tusd1.org 

Notice of Nondiscrimination/Aviso De No Discriminacion